

























The WITHINGS WBS08 Body Scan Smart Scale in Black is a cutting-edge device that allows you to easily track and monitor your weight, body composition, and overall health.
Key features include:
- Highly accurate weight measurement
- Advanced body composition analysis
- Wi-Fi and Bluetooth connectivity for seamless data syncing
- Compatible with a wide range of health and fitness apps
- Sleek and modern design that looks great in any bathroom
- Multi-user support with automatic recognition of up to 8 users
- Easy-to-read LED display for quick and convenient readings
| Manufacturer | Withings |
|---|---|
| GTIN | 3700546707957 |
| Model Number | WBS08 |
| Product Dimensions | 2.8cm x 3.2cm x 35.7cm |
| Anomaly Detection | Detect atrial fibrillation, the most common cardiac anomaly |
| Cardiovascular Risk Assessment | Yes |
| Baby Mode | Yes |
| Athlete Mode | Yes |
| Display Details | Colour |
| Electrocardiogram | Yes |
| Monitor Nerve Health | Yes |
| Monitor Vascular Health | Yes |
| Number of Users | 8 |
| Muscle/Fat Percentage | Yes |
| Pregnancy Mode | Yes |
| Smart App Control | Synchronize your health data with the Withings app |
| Tracks Metabolic Parameters | Yes |
WITHINGS WBS08 Body Scan Smart Scale - Black
- Warranty 2 Years
